Tag Archives: Case Study

Explosive PCCP Myths Busted

PCCP Case Study: Explosive Myths Busted Pre-stressed concrete cylinder pipe safe for tapping and more Overview Prestressed concrete cylinder pipe (AWWA C301) gets a bad rap. Despite rumors and outdated information, the pipe is in service in all 50 states. First installed after World War II, PCCP is one of the most rigid and long-lasting […]

After 60 Years, PCCP Still Best Choice

PROJECT OVERVIEW Not long after acquiring Detroit Water, the Great Lakes Water Authority required 3-miles of pipe to meet the suburban sprawl demand. The entity specified 48” steel and prestressed concrete cylinder pipe (PCCP). PCCP is a rigid pipe, installation moves quickly. Harness clamps speed up installation time and reduce costs. The two-clamp mechanically restrained […]