Misc

Read More

Case Study: Three Layers Of Joint Protection

September 28, 2020

Read this case study and learn how Thompson Pipe Group protects steel components in concrete pressure pipe joints with three layers of exterior protection: zinc metallized coating, cement mortar and Typar/Ethafoam. 

Continue Reading
Read More
Snap Rings© installation

Case Study: Snap Ring Offers Installation Benefits

April 1, 2020

A Snap Ring® is a mechanically restrained joint system with several benefits. Read this case study and learn more:

Continue Reading
Read More

Case Study: Sliplining Water Main Saves Money And Time

March 25, 2020

Every drop of water is precious in the Sonoran Desert. The City of Phoenix saved time and money by selecting sliplining as the repair option. Thompson Pipe Group manufactured and delivered approximately 1-mile of 56-inch steel liner pipe and gave the existing 60” watermain renewed life. Read this case study to learn more.

Continue Reading