Every drop of water is precious in the Sonoran Desert. The City of Phoenix saved time and money by selecting sliplining as the repair option. Thompson Pipe Group manufactured and delivered approximately 1-mile of 56-inch steel liner pipe and gave the existing 60” watermain renewed life. Read this case study to learn more.